Encompass Partners

Encompass Partners

Results 41-61 of 61

Set Descending Direction
per page
Page
View List Grid
  1. Enhanced Modbus Master/Slave Serial
    Availability:
    Forward delivery 6-9 weeks
  2. Communication Module,EtherNet/IP to DeviceNet Linking Device, DLR
    Availability:
    Forward delivery 6-9 weeks
  3. Fan, Heatsink, Frame 2
    Part No.: SK-G9-FAN1-F2
    Fan, Heatsink, Frame 2
    UOM: EA
    Availability:
    Forward delivery 6-9 weeks
  4. STANDARD CONTROL MODULE
    Part No.: 41391-454-01-S1FX
    STANDARD CONTROL MODULE
    UOM: EA
    Availability:
    Forward delivery 6-9 weeks
  5. Braking Resistor Resistance 3.3 Ohm
    Availability:
    Forward delivery 6-9 weeks
  6. MODBUS TCP/IP COMMUNICATION MODULE
    Availability:
    Forward delivery 6-9 weeks
  7. DNP3 Slave Gateway
    Part No.: PLX51-DNPS
    DNP3 Slave Gateway
    UOM: EA
    Availability:
    Forward delivery 6-9 weeks
  8. Modbus Master/Slave Enhanced Network Interface Module for ControlLogix
    Availability:
    Forward delivery 6-9 weeks
  9. Implementation of Cyber Security Solution for New DM Plant HMI System at G-Station Jebel Ali (Tender Ref/Item : 2252000057/1)
    Part No.: 30208998-V3.0-25-10-21
    Implementation of Cyber Security Solution for New DM Plant HMI System at G-Station Jebel Ali (Tender Ref/Item : 2252000057/1)
    UOM: EA
    Upgrade of existing Controllogix Controllers - Upgrade of existing Redundancy Modules - Upgrade of existing Communication Modules - Supply of Dell Servers, Workstations and configurations - Supply & Configuration of Acronis Back-up Software for Servers and Workstations - Supply & Configuration of NAS Storage Device 6TB - Domain Controller as per Section 1.2.2.2 - Supply of Ethernet Switch as per Section 1.2.2.6 - Server Rack as per Section 1.2.2.8 - Configuration and Implementation of Cyber Security Activities as per Appendix – B. - Supply & Configuration of Symantec CSP for the Servers and Workstations. - Modifications in existing PLC for the above upgrade. - SCADA application conversion to FTView SE. - Design & Detailed Engineering. - Project Management - Delivery - Commissioning  
    Rockwell Automation Software Support for 1 Year – TechConnect: Self Assist Support as per Section 1.2.2.1 for Demin System.
    More
    Availability:
    Forward delivery 6-9 weeks
  10. Enhanced Liquid & Gas Flow Computer for ControlLogix®
    Availability:
    Forward delivery 6-9 weeks
  11. Motor Feedback 60m control cable
    Part No.: 2090-UXNFBMP-S60
    Motor Feedback 60m control cable
    UOM: EA
    Availability:
    Forward delivery 6-9 weeks
  12. Motor Feedback 20m control cable
    Part No.: 2090-UXNFBMP-S20
    Motor Feedback 20m control cable
    UOM: EA
    Availability:
    Forward delivery 6-9 weeks
  13. Cable,Non-Flex,Motor Power,MP/1326AB,10 Gauge,30M
    Availability:
    Forward delivery 6-9 weeks

Results 41-61 of 61

Set Descending Direction
per page
Page
View List Grid