Wiring Accessories

Wiring Accessories

Results 361-386 of 386

Set Descending Direction
per page
Page
View List Grid
  1. Compensating actuator, flat
    Availability:
    Forward delivery 6-9 weeks
  2. 20A DOUBLE POLE WITH INDICATOR.  F9025
    Availability:
    Forward delivery 6-9 weeks
  3. 1G TEL OUT MASTER.  P360
    Availability: In stock
  4. 2G TV CO-AX OUT.  P352
    Availability: In stock
  5. Plug-in surge arresters, 4 p, 280VAC, 4 x 20 kA
    Availability:
    Forward delivery 6-9 weeks
  6. 3PIN LSC CEILING ASSEMBLY
    Availability:
    Forward delivery 6-9 weeks
  7. Diffuse reflective sensor, Sn=50mm, 4L, 10-30VDC, NPN, PNP, M18, insulated material, M12.  13104RQD07
    Availability:
    Forward delivery 6-9 weeks
  8. Shunt Trip 220/240V AC/DC.  MST2
    Availability:
    Forward delivery 6-9 weeks
  9. Spring releas 220/240V AC/DC.  MSRR
    Availability:
    Forward delivery 6-9 weeks
  10. Over current switch, 0,5A, 1p, Z-Char, AC
    Availability:
    Forward delivery 6-9 weeks
  11. Adjustable roller lever
    Availability:
    Forward delivery 6-9 weeks
  12. Adjustable roller lever, D=18mm
    Availability:
    Forward delivery 6-9 weeks
  13. Contact element, 1 N/C, front mount, 6. contact, spring clamp connection
    Availability:
    Forward delivery 6-9 weeks
  14. Main switch, 3 pole, 32 A, Emergency-Stop function, Lockable in the 0 (Off) position, surface mounting, hard knockout version
    Availability:
    Forward delivery 6-9 weeks
  15. Main switch, 3 pole, 100 A, Emergency-Stop function, Lockable in the 0 (Off) position, rear mounting
    Availability:
    Forward delivery 6-9 weeks
  16. Main switch, 3 pole, 63 A, Emergency-Stop function, Lockable in the 0 (Off) position, surface mounting
    Availability:
    Forward delivery 6-9 weeks
  17. Power supply unit, 1-phase, 100-240VAC/24VDC, 5A
    Availability:
    Forward delivery 6-9 weeks
  18. Plunger head
    Part No.: S-AT4
    Plunger head
    UOM: EA
    Availability:
    Forward delivery 6-9 weeks
  19. Step switches, Contacts: 4, 20 A, front plate: 1-4, 45 °, 4 steps, 45°, maintained, flush mounting
    Availability:
    Forward delivery 6-9 weeks
  20. Step switches, Contacts: 4, 20 A, front plate: 0-4, 45 °, 4 steps, 45°, maintained, flush mounting
    Availability:
    Forward delivery 6-9 weeks
  21. Step switches, Contacts: 6, 20 A, front plate: 0-3, 45 °, maintained, flush mounting
    Availability:
    Forward delivery 6-9 weeks
  22. Reversing switches, Contacts: 5, 32 A, front plate: 1-0-2, 45 °, maintained, flush mounting
    Availability:
    Forward delivery 6-9 weeks
  23. Undervoltage release, 240V50Hz
    Part No.: U-PKZ0(240V50HZ)
    Undervoltage release, 240V50Hz
    UOM: EA
    Availability:
    Forward delivery 6-9 weeks

Results 361-386 of 386

Set Descending Direction
per page
Page
View List Grid