Shop By
-
AED 53.25Availability:Forward delivery 5-7 weeks -
AED 58.13Availability:Forward delivery 5-7 weeks -
Part No.: MWI6253L-255W2500A 3P Standard frame 65kA D/O mounting 520i-LSIG ACB. MWI6253L-255WUOM: EA
AED 40,670.42Availability:Forward delivery 5-7 weeks -
AED 44,464.17Availability:Forward delivery 5-7 weeks -
Part No.: DILM25-01(230V50HZ,240V60HZ)Contactor, 3p+1N/C, 11kW/400V/AC3. DILM25-01(230V50HZ,240V60HZ)UOM: EA
AED 105.12Availability:Forward delivery 5-7 weeks -
AED 225.65Availability:Forward delivery 5-7 weeks -
Part No.: T0-2-8221/EChangeoverswitches, Contacts: 4, 20 A, front plate: 1-2, 90 °, maintained, flush mountingUOM: EA
AED 59.97Availability: In stock -
AED 312.02Availability:Forward delivery 5-7 weeks -
AED 126.21Availability:Forward delivery 5-7 weeks -
AED 27.97Availability: In stock -
Part No.: MAGNUM-ACB2500A 4P Standard frame 65kA D/O Mounting 520-LSI ACB. MWI6254LEA2552NPRR2YNNNWXUOM: EA
AED 41,000.00Availability:Forward delivery 5-7 weeks -
Part No.: DMV-1000N/4Switch-disconnector, DMV, 1000 A, 4 pole, Stop Function optional, Without rotary handle and drive shaft. DMV-1000N/4UOM: EA
AED 1,381.97Availability:Forward delivery 5-7 weeks -
Part No.: DMV-400N/4Switch-disconnector, DMV, 400 A, 4 pole, Stop Function optional, Without rotary handle and drive shaft. DMV-400N/4UOM: EA
AED 440.60Availability:Forward delivery 5-7 weeks -
Part No.: P1-25/I2/SVB-SW/HI11MAIN SWITCH, 3 POLE + 1 N/O + 1 N/C, 25 A, EMERGENCY STOP FUNCTION, LOCKABLE IN THE 0 (OFF) POSITION, SURFACE MOUNTING. P1-25/I2/SVB-SW/HI11UOM: EA
AED 130.86Availability:Forward delivery 5-7 weeks -
Part No.: T0-2-8241/EStep switches, Contacts: 3, 20 A, front plate: 0-3, 45 °, 3 steps, 45°, maintained, flush mountingUOM: EA
AED 65.56Availability:Forward delivery 5-7 weeks -
Part No.: T0-3-15924/EVoltmeter selector switches, Contacts: 6, 20 A, 3 x phase-phase, 3 x phase-N, front plate: Phase/Phase-Phase/N, 60 °, maintained, flush mountingUOM: EA
AED 83.79Availability:Forward delivery 5-7 weeks -
AED 350.00Availability:Forward delivery 5-7 weeks






















