M22 Command & Control

Shop By

Results 6601-6640 of 7844

per page
View List Grid
  1. Contactor, 3p, 37kW/400V/AC3
    Part No.: DILM72(24V50/60HZ)
    Contactor, 3p, 37kW/400V/AC3
    UOM: EA
    AED 306.95
    Availability:
    Forward delivery 5-7 weeks
  2. RCBO 20A C 100mA 1+N pole 10kA
    Part No.: eRBM-20/1/C/01-ME
    RCBO 20A C 100mA 1+N pole 10kA
    UOM: EA
    AED 164.59
    Availability:
    Forward delivery 5-7 weeks
  3. Over current switch, 0,5A, 1p, Z-Char, AC
    AED 135.54
    Availability:
    Forward delivery 5-7 weeks
  4. Adjustable roller lever
    AED 37.28
    Availability:
    Forward delivery 5-7 weeks
  5. Insulated enclosure, IP65_x, narrow
    AED 24.46
    Availability:
    Forward delivery 5-7 weeks
  6. Adjustable roller lever, D=18mm
    AED 27.41
    Availability:
    Forward delivery 5-7 weeks
  7. 8012199VX  VX SPECIAL DIMENSION SHEET STEEL W1000MMxH2000MMxD800MM, RAL7035, 12368187 #20
    AED 12,000.00
    Availability:
    Forward delivery 5-7 weeks
  8. Main switch, 3 pole, 32 A, Emergency-Stop function, Lockable in the 0 (Off) position, surface mounting, hard knockout version
    AED 125.54
    Availability:
    Forward delivery 5-7 weeks
  9. MAIN SWITCH, 3 POLE, 100 A, EMERGENCY-STOP FUNCTION, LOCKABLE IN THE 0 (OFF) POSITION, REAR MOUNTING
    Regular Price AED 347.29 Special Price AED 173.65
    Availability:
    Forward delivery 5-7 weeks
  10. Main switch, 3 pole, 63 A, Emergency-Stop function, Lockable in the 0 (Off) position, surface mounting
    AED 239.31
    Availability:
    Forward delivery 5-7 weeks
  11. Power supply unit, 1-phase, 100-240VAC/24VDC, 5A
    AED 429.77
    Availability:
    Forward delivery 5-7 weeks
  12. Plunger head
    Part No.: S-AT4
    Plunger head
    UOM: EA
    AED 24.53
    Availability:
    Forward delivery 5-7 weeks
  13. Step switches, Contacts: 4, 20 A, front plate: 1-4, 45 °, 4 steps, 45°, maintained, flush mounting
    AED 66.15
    Availability:
    Forward delivery 5-7 weeks
  14. Step switches, Contacts: 4, 20 A, front plate: 0-4, 45 °, 4 steps, 45°, maintained, flush mounting
    AED 66.15
    Availability:
    Forward delivery 5-7 weeks
  15. Step switches, Contacts: 6, 20 A, front plate: 0-3, 45 °, maintained, flush mounting
    AED 83.79
    Availability:
    Forward delivery 5-7 weeks
  16. Reversing switches, Contacts: 5, 32 A, front plate: 1-0-2, 45 °, maintained, flush mounting
    AED 153.97
    Availability:
    Forward delivery 5-7 weeks
  17. Undervoltage release, 240V50Hz
    Part No.: U-PKZ0(240V50HZ)
    Undervoltage release, 240V50Hz
    UOM: EA
    AED 72.15
    Availability:
    Forward delivery 5-7 weeks
  18. Auxiliary contact, 4N/O, surface mounting, screw connection
    AED 28.44
    Availability:
    Forward delivery 5-7 weeks
  19. CONTROL RELAY, 4 POLE, 50-60 HZ, 600V, 2NO 2NC 120VAC, D15 SERIES.  D15CR22AB
    AED 400.00
    Availability:
    Forward delivery 5-7 weeks
  20. XClear MCB 6A 6KA SP
    Part No.: CLS6-C6-DE
    XClear MCB 6A 6KA SP
    UOM: EA
    AED 10.00
    Availability:
    Forward delivery 5-7 weeks
  21. CONNECTION TERMINAL, 630A, 4P, FLAT/ROUND.  K2X240/4
    AED 2,311.69
    Availability:
    Forward delivery 5-7 weeks
  22. Contactor relay, 3N/O+1N/C, AC
    Part No.: DILER-31(230V50HZ,240V60HZ)
    Contactor relay, 3N/O+1N/C, AC
    UOM: EA
    AED 103.19
    Availability:
    Forward delivery 5-7 weeks
  23. Changeoverswitches, Contacts: 8, 100 A, front plate: 1-0-2, 60 °, maintained, flush mounting
    AED 549.63
    Availability:
    Forward delivery 5-7 weeks
  24. Changeoverswitches, Contacts: 8, 63 A, front plate: 1-0-2, 60 °, maintained, flush mounting
    AED 357.57
    Availability:
    Forward delivery 5-7 weeks
  25. Changeoverswitches, Contacts: 8, 32 A, front plate: 1-0-2, 60 °, maintained, flush mounting
    AED 188.76
    Availability:
    Forward delivery 5-7 weeks
  26. Changeoverswitches, Contacts: 8, 20 A, front plate: 1-0-2, 60 °, maintained, flush mounting
    AED 101.37
    Availability:
    Forward delivery 5-7 weeks
  27. Lifting eye for Xenergy enclosure
    AED 44.62
    Availability:
    Forward delivery 5-7 weeks
  28. Busbar support, 30x30x1300
    Part No.: XNNS-30X30X1300
    Busbar support, 30x30x1300
    UOM: EA
    AED 290.92
    Availability:
    Forward delivery 5-7 weeks
  29. 20A GHB 1P BKR
    Part No.: GHB1020
    20A GHB 1P BKR
    UOM: EA
    AED 250.00
    Availability:
    Forward delivery 5-7 weeks
  30. 15A GHB 1P BKR
    Part No.: GHB1015
    15A GHB 1P BKR
    UOM: EA
    AED 250.00
    Availability:
    Forward delivery 5-7 weeks
  31. 40A GHB 1P BKR
    Part No.: GHB1040
    40A GHB 1P BKR
    UOM: EA
    AED 250.00
    Availability:
    Forward delivery 5-7 weeks
  32. 80A GHB 1P BKR
    Part No.: GHB1080
    80A GHB 1P BKR
    UOM: EA
    AED 250.00
    Availability:
    Forward delivery 5-7 weeks
  33. 200A/3P HD Non-Fusible Safety Switch 600V Nema 3R
    AED 11,250.00
    Availability:
    Forward delivery 5-7 weeks

Results 6601-6640 of 7844

per page
View List Grid